Project Summary

Project Name

How we achieved $38,800 in savings for this cosmetic packaging project

Country

Indonesia

Client Identity

CEO

Order Amount

$204,800.00

Order Quantity

88000

Project Year

2016

Service Scope

Custom manufacturing services, Packaging process optimization services, TCO optimization services, Certification support, Logistics services

Client Reviews

"As a beauty business operating in Southeast Asia, logistics and product quality were our biggest headaches. You not only solved these major issues but also tangibly reduced our costs. The logistics breakage rate was lower than promised, and customs clearance was fast. Although the quote was slightly higher than we expected, the savings on hidden costs far outweighed the price difference—it was absolutely worth it!"

Background

In 2016, Southeast Asia’s economy was growing rapidly, driving a surge in demand for beauty products. However, the local supply chain was underdeveloped and logistics infrastructure was weak. Additionally, new EU environmental regulations indirectly impacted the region's beauty export market, leading to heightened client requirements regarding packaging abrasion resistance and logistics reliability. The client was a mid-range beauty brand (established in the local market for 15 years, specializing in high-value-for-money skincare products.

Client Requirements

Secure and execute a $200,000 order for glass lotion bottles featuring internal oil-based gloss coating, selective hot stamping, and multi-color screen printing. Requirements included obtaining basic environmental certifications and meeting strict quality standards (abrasion resistance ≥ Grade 4.5; hot stamping adhesion ≥ 4B; screen printing registration tolerance ≤ 0.2mm; defect rate ≤ 3.0%). Delivery had to be completed within three months, with logistics breakage rates ≤ 2.0% and customs clearance times ≤ 7 days. The quote needed to be 8% lower than the existing supply chain's pricing, and actionable cost-optimization suggestions had to be provided. The project aimed to resolve challenges regarding poor logistics reliability, high product defect rates, and a lack of cost-optimization advice, while helping the client navigate local logistics limitations and export-related environmental pressures to establish a long-term partnership.

Requirements Analysis

1. Analysis of Client Pricing Requirements: The client was operating during a period of rapid growth in the Southeast Asian beauty market. Their core needs were "low cost + high reliability + low defect rate." With moderate procurement volumes and a strong focus on cost control, they sought to reduce costs—which had previously been inflated by logistics issues and product defects—by demanding a quote 8% lower than their existing supply chain. The primary objectives were to lower procurement and hidden costs, enhance logistics reliability, ensure smooth product delivery, and capitalize on local market growth opportunities, all while meeting basic environmental standards for export markets.

2. Competitor Price Analysis: For a glass emulsion bottle featuring internal oil-based glossy coating, hot stamping, and screen printing, the industry average price is $2.20–$2.50 per unit. The client’s existing supply chain quotes $2.45 per unit, while the client targets a price of $2.25 per unit (92% of the current $2.45 quote). After calculating costs, we issued an initial quote of $2.30 per unit—a $0.05 gap from the target. We plan to bridge this gap by optimizing production processes and logistics solutions to reduce costs, while emphasizing our cost-optimization capabilities and advantages regarding low hidden costs to align with the client's core needs.

3. Cost Breakdown: Raw materials (borosilicate glass) account for 45%; internal oil-based glossy coating (eco-friendly, abrasion resistance ≥ Grade 5) for 17%; selective hot stamping (high-adhesion foil) for 16%; screen printing (multi-color, high precision) for 12%; certification costs (basic environmental compliance) for 3%; logistics and taxes (dedicated Southeast Asia route, breakage-resistant packaging) for 5%; and reasonable profit for 2%. Hidden costs associated with the client's existing supply chain (logistics breakage, rework, excess inventory, etc.) account for approximately 8% of total procurement costs and are a key focus for optimization.

4. Core Challenges: Upgrade the internal oil-based glossy coating's abrasion resistance to Grade 4.5 and hot stamping adhesion to 4B, while ensuring compliance with basic environmental certifications; provide actionable cost-optimization recommendations to reduce the client's Total Cost of Ownership (TCO) by ≥8%, limit logistics breakage rates to ≤2.0%, and keep customs clearance times within 7 days; deliver approximately 87,000 units (based on the initial $2.30 quote) within three months while balancing cost, quality, and lead times; successfully negotiate pricing to reach a consensus; and assist the client in addressing logistics bottlenecks in Southeast Asia and environmental compliance pressures related to exports.

Action

1.Initial Follow-up: The follow-up process spanned one month and involved nine interactions—three video conferences and six email exchanges. We precisely aligned with the client’s procurement and cost-control teams, gaining a detailed understanding of their hidden cost structures, quality standards, and cost-optimization requirements. We demonstrated our capabilities by presenting case studies on cost optimization and successful environmental certifications, alongside a proposal for controlling hidden costs. Concurrently, we researched the local logistics market in Southeast Asia and signed cooperation agreements with three specialized logistics providers for the region; this enabled us to streamline customs clearance, ensure logistics transparency, and mitigate local logistical bottlenecks.

2. Price Negotiation (Leveraging cost optimization + Demonstrating value + Strategic concessions): Initially, the client questioned our quote of $2.30 per unit, noting that it failed to meet the target of being "8% lower than the existing supply chain." They requested a price reduction of $0.05 per unit and demanded a guarantee that our cost-optimization recommendations would reduce the Total Cost of Ownership (TCO) by at least 8%, with us bearing the liability for any shortfall; they indicated that failure to meet these terms would lead them to consider a competitor offering a price of $2.28 per unit. We engaged in a strategic negotiation centered on cost optimization to achieve a win-win outcome: Step 1 involved candidly addressing the price gap—clarifying that the $0.05/unit difference stemmed from our investment in eco-friendly materials and manufacturing precision rather than a mere markup. We highlighted our use of eco-friendly, high-durability (Grade 5 abrasion resistance) glossy internal spray coatings—which cost 6% more than standard industry alternatives—and high-adhesion hot-stamping foils (4% more expensive), both of which effectively reduce product rework rates. Step 2 focused on value restructuring and hidden costs; we presented a cost-optimization plan promising to cut the client's hidden costs by over 12%—far exceeding their 8% requirement—through optimized logistics packaging, inventory management advice, and improved product yield rates, ensuring a significant drop in Total Cost of Ownership (TCO) despite a quote slightly above expectations. Step 3 involved internal optimization to trim costs: we signed bulk procurement agreements to lower borosilicate glass costs by 3%; refined internal spraying and hot-stamping processes to reduce labor waste and cut processing costs by 2%; and adopted custom anti-breakage packaging and optimized logistics routes to lower logistics costs by 1%, bringing our quote to $2.26/unit—close to the client's target of $2.25/unit. Step 4 introduced value-added commitments: we offered three tailored cost-optimization plans (logistics, inventory management, and process adaptation) at no extra cost, assigned a dedicated specialist to assist with implementation, and guaranteed a TCO reduction of at least 8%. We pledged to cover any losses from excess hidden costs (up to 5% of the order value) if targets were missed. We also committed to a logistics breakage rate of ≤2.0% (with free replacements for any excess) and a customs clearance time of ≤7 days (with compensation of 0.8% of the order value per day of delay). After two rounds of negotiation (spanning five days and four discussions), the client recognized our cost-optimization capabilities and sincerity, accepted the $2.26/unit price, and signed the order.

3. Process Optimization and Certification: To address technical challenges and meet the client's high standards, a dedicated five-person process team was assembled. They optimized the internal spraying process by selecting an eco-friendly, high-adhesion, oil-based glossy lacquer and strictly controlling the coating thickness (0.04 mm) and baking parameters (130°C for 25 minutes), thereby raising the abrasion resistance rating to Level 5. For the hot stamping stage, the team selected high-adhesion foil and optimized temperature (110°C) and pressure settings to ensure an adhesion rating of ≥4B. In the screen printing stage, high-precision screens were used to maintain pattern clarity at ≥98%, preventing issues such as blurring or peeling. Simultaneously, the team submitted applications for essential environmental certifications, assigning dedicated personnel to manage the process—compiling product test reports, material compliance documents, and production workflow records. Certification was secured in just 35 days—meeting export market environmental standards and reducing the certification timeline by 25% compared to industry peers.

4. Sample Coordination: Based on the optimized processes and client design specifications, three batches of samples (50 units per batch) were produced, with the client paying a $2,000 deposit. Addressing issues identified in the first batch—specifically localized hot stamping adhesion deficiencies (3.5B) and slight blurring in screen-printed patterns—the team optimized stamping parameters and adjusted screen printing equipment while increasing the frequency of sample inspections. The final samples passed both client and third-party testing, meeting all requirements and receiving client approval.

5. Production Control: Production workflows were optimized through a "three-tier inspection system" (in-process, batch, and finished product checks). Each batch underwent random sampling of 500 units, focusing on internal coating abrasion resistance, hot stamping adhesion, and screen printing clarity; non-conforming products were immediately reworked to ensure a defect rate of ≤3%. Two production lines were efficiently allocated using a 12-hour shift system, with a five-day buffer period included to guarantee delivery within three months. Custom anti-damage packaging (foam cushioning and reinforced cardboard boxes) was utilized to minimize logistics-related breakage. Additionally, the team collaborated closely with specialized Southeast Asia logistics providers to prepare customs clearance documents in advance and streamline procedures, ensuring clearance was completed within seven days, while establishing a real-time logistics tracking system to provide daily status updates to the client.

progress

Results

(Data calculated based on client feedback and documentation)

1.Quality and Compliance Results: Delivered a final batch of 88,000 glass lotion bottles. The internal oil-based glossy coating achieved a friction resistance rating of Level 5.2; localized hot stamping adhesion reached 4.5B; screen-printed pattern clarity was 98.5%; and the defect rate was 2.1% (below the client's 3% limit). The product passed initial environmental certification and fully met export market environmental standards, enabling a smooth market launch with zero testing failures.

2. Cost Optimization Results (figures calculated based on client feedback and documentation): Through our optimization solutions, the client's Total Cost of Ownership (TCO) decreased by 13.2%—far exceeding the 8% target. Logistics breakage rates dropped to 1.2% (below the promised 2.0%), rework rates fell to 0.3%, and excess inventory was reduced by 80%, resulting in total savings of approximately $38,800 USD. Our quoted price of $2.26 per unit was 7.8% lower than the previous supply chain cost—approaching the 8% target—significantly enhancing the cost-effectiveness of the client's procurement.

3. Delivery and Logistics Performance: Deliveries were completed on schedule with zero delays. Customs clearance averaged 5.2 days—well within the promised 7-day timeframe—and real-time, transparent tracking allowed the client to monitor shipment status at any time. We effectively resolved the client's logistics challenges and overcame common logistical bottlenecks in Southeast Asia. 

Logo

Have a Similar Procurement Project?

Our team has rich experience in custom production, able to provide one-stop solutions from design, proofing to mass production.

Talk to Our Team
+86 - 18588993945
Arno Avatar

Sales Manager

Jasper

Online
WhatsApp: QR Code
TOP